- New Residence Hall
- About the Project
- Construction Photos
- As of 08/15/07
- As of 05/25/07
- As of 04/24/07
- As of 04/06/07
- As of 03/28/07
- As of 03/01/07
- As of 01/17/07
- As of 12/19/06
- As of 12/07/06
- As of 11/20/06
- As of 11/08/06
- As of 10/24/06
- As of 09/25/06
- As of 09/13/06
- As of 09/11/06
- As of 09/07/06
- As of 09/02/06
- As of 08/23/06
- As of 08/19/06
- As of 08/16/06
- As of 07/31/06
- As of 07/24/06
- As of 07/18/06
- As of 07/06/06
- As of 06/27/06
- As of 06/23/06
- As of 06/19/06
- As of 06/14/06
- As of 06/07/06
- As of 06/06/06
- As of 05/30/06
- As of 05/25/06
- As of 05/22/06
- As of 05/15/06
- As of 05/08/06
- As of 05/01/06
- As of 04/06/06
- Project Details
- Virtual Tours
As of 05/25/07
All brick veneer is done, preparing to do courtyard![]() |
Closeup of corian and sink in typical bathroom![]() |
Interior walls sanded and waiting to be painted![]() |
Typical bathroom vanity with corian top![]() |
Typical cabinets in kitchenette area![]() |
Typical corridor wall![]() |
Typical lounge area in suite![]() |
Typical overhead light in bedroom![]() |
Typical stairwell![]() |
Typical study area on each floor![]() |
Typical suite corridor refer to virtual tour for graphic example![]() |
Typical toilet and sink![]() |
Vaulted roof is complete![]() |
Very busy area above corridor drop ceilings![]() |
Page last updated: Jun. 6, 2006
















